Main testing equipment configuration for Level 4 repair, installation, and testing qualifications
brief introduction
On December 1, 2017, the National Energy Administration made corresponding adjustments to the qualification equipment for power testing. The qualification equipment for testing in each province and region is the same, and some equipment that is not commonly used by power enterprises in actual work is omitted. A brief introduction is given to the new version of the construction equipment selection guide required for the installation (repair, testing) and testing of Level 4 power facilities license.
Obtaining a Level 4 Installation (Repair, Testing) License, one can engage in the installation, maintenance, or testing activities of power facilities with voltage levels below 35 kV.
To learn about the application materials and filling specifications for the installation, maintenance, and testing of power facility licenses, you can click on "Application Specifications" to browse.
Alternative names: Level 4 testing instruments, Level 4 testing equipment, Testing instruments and equipment, Level 4 testing configuration table, Level 4 testing equipment, Level 4 testing and inspection equipment selection table
configuration table
Test Level 4 Configuration Table
Serial Number
|
Name of machinery and equipment
|
unit
|
number
|
specificationsSpecification and model
|
|
NO1
|
High voltage generating equipment
|
||||
1
|
DC high voltage generator
|
cover
|
1
|
DC:120kV/2mA
|
***
|
2
|
Power frequency withstand voltage test device
|
cover
|
1
|
AC:30kVA/50kV
|
***
|
cover
|
1
|
AC:6kVA-10kVA/50kV
|
***
|
||
3
|
Complete set of equipment for frequency conversion series resonance test
|
cover
|
1
|
75kVA/75kV/1A
30~300Hz |
***
|
4
|
Induction voltage withstand test device
|
cover
|
1
|
5kVA/360V
150Hz |
***
|
NO2
|
Electrical measuring instruments
|
||||
1
|
High voltage dielectric loss tester
|
tower
|
1
|
1. The accuracy of medium measurement is 1%
2. The capacitance accuracy is 0.5%
3. Anti interference frequency conversion
|
***
|
2
|
Three phase relay protection tester
|
tower
|
1
|
Two sets of three-phase voltage and current each
|
***
|
3
|
Loop resistance tester
|
tower
|
1
|
DC:≥100A
|
***
|
4
|
Transformer volt ampere characteristic tester
|
tower
|
1
|
500V/5A
|
***
|
5
|
Ground Resistance Tester
|
tower
|
1
|
|
***
|
6
|
Transformer DC resistance tester
|
tower
|
1
|
DC:≥10A
|
***
|
7
|
Transformer ratio tester
|
tower
|
1
|
Digital 0.5 level
|
***
|
8
|
Circuit breaker characteristic tester
|
tower
|
1
|
|
***
|
9
|
insulation resistance tester
|
tower
|
1
|
DC:0~5000V 200G(Ω)
Short circuit current ≥ 3mA |
***
|
NO3
|
Common instruments and meters
|
||||
1
|
Megger
|
only
|
1
|
DC:2500V
|
***
|
2
|
Megger
|
only
|
1
|
DC:500V
|
***
|
3
|
Digital dual clamp phase voltmeter
|
only
|
1
|
measuring current1mA~5A
|
***
|
注:1. All national users who purchase our products enjoy free technical guidance, software upgrades, one-year warranty, and lifelong maintenance services.
2. For more product information, please enter the product center. Service Hotline: 027-85824876
qualified
Those who have obtained the license for installing (repairing, testing) power facilities in the fourth level testing category can engage in testing activities for power facilities with voltage levels below 35 kV. The applicant shall meet the following conditions:
1. Legal personality and well-established organizational structure
2. Registered capital and net assets of over 6 million yuan
3. The technical director and safety director have more than 3 years of experience in power facility testing and management, and have the qualification for junior or above technical positions in power related majors
4. More than 10 professional technical and economic management personnel, including 4 or more power related engineering and technical personnel
5. More than 6 electricians holding a network operation permit, including 2 or more high-voltage electricians and 3 or more special electricians
6. Establish a sound and effective safety production organization and system, conduct safety training in accordance with the law, and have at least one safety management personnel
7. Fixed business premises with a total area of over 400 square meters, various professional laboratories, and testing equipment for power facilities with voltage levels above 35 kV
8. A sound system for managing technical archives